Request a Quote

Die Cast CNC Machining Zinc Material Housing

Moldie offers precision die casting CNC machining zinc material housings, utilizing advanced technology and expertise in machining zinc components.

Our comprehensive services include working with various zinc alloys, providing surface treatments, and offering customizable solutions to meet unique requirements.

SKU: MLD-13-ZD015-1Categories: Zinc Die Casting Mold
Contact Us

This page covers die casting mold tooling for zinc housings that also need a clear plan for later CNC work on the casting. Moldie designs and builds the mold—DFM, CNC machining of the die, and tryout support—rather than offering a generic catalog of finished housings.

What this mold is for

The mold is used to produce zinc material housings by high pressure die casting. Where the housing will be CNC machined after casting, machining stock is treated as a part requirement during DFM. The zinc alloy specified for the part is a part specification; mold steels, bolsters, and heat treatment are specified separately for the die.

Tooling scope

  • DFM review of HPDC filling and of machining stock allowances on housing faces, bores, or datums that will be finished later
  • Mold design for parting, gating, runners, overflow, venting, and ejection of the housing
  • CNC machining of mold cavities and cores, then fitting and assembly of the tooling
  • Tryout support and dimensional feedback on first housing samples from the mold

Materials note

Part alloy is zinc alloys as specified for the part. Mold steel is tool steel with appropriate hardness for die casting dies. Do not treat part-alloy hardness or surface treatments as mold-steel heat treatment. Sand blasting, powder coating, or painting, when required, are part surface treatment options for the housing, not mold treatments.

For a mold quotation, provide housing drawings, the zinc alloy specified for the part, notes on any post-cast CNC, volume, and inspection requirements.

Trade information (mold tooling)

MOQ 1 set
Mold lead time T1 sample, about 3-10 weeks, according to the mold requirement
Production lead time 2-5 weeks, according to the order Qty
Mold payment term 50% T/T deposit with PO, balance 50% T/T after sample approved
Products payment term 30% T/T deposit with PO, balance 70% T/T before shipment
Port of loading Ningbo or Shanghai port

Request a Quote

Contact Form

Accepted file types: jpg, gif, png, pdf, step, stp, igs, Max. file size: 40 MB, Max. files: 5.

Contact Us Today

Contact Form

Accepted file types: jpg, gif, png, pdf, step, stp, igs, Max. file size: 40 MB, Max. files: 5.